Pump Rate from Wet Well Drawdown

Formula

Volume, gal = Area, ft² x Drop, ft x 7.48
Pump rate, gpm = Volume / minutes + inflow, gpm
Inputs used
  • Wet well area (ft²)
  • Level drop (ft)
  • Time for the drop (min)
  • Inflow during the test (optional) (gpm)

Worked example (White River WRRF, fictional)

  1. Volume = 80 x 2 x 7.48 = 1,197 gal
  2. Rate = 1,197 / 3 = 399.0 gpm

Total Dynamic Head (Hazen-Williams)

Formula

Friction loss, ft = 10.44 x L x Q^1.85 / (C^1.85 x d^4.8655)   (Q gpm, d inches, L ft)
TDH = Static head + Friction loss + Minor losses
Inputs used
  • Static head (lift) (ft)
  • Pipe length (equivalent) (ft)
  • Pipe inside diameter (in)
  • Hazen-Williams C
  • Flow (gpm)
  • Minor losses (optional) (ft)

Worked example (White River WRRF, fictional)

  1. Friction = 10.44 x 1,200 x 1,000^1.85 / (120^1.85 x 8^4.8655) = 25.55 ft
  2. TDH = 35 + 25.55 + 3 = 63.6 ft

Pump Horsepower and Power Cost

Formula

WHP = gpm x TDH, ft x SG / 3,960
BHP = WHP / pump efficiency
Motor hp = BHP / motor efficiency
kW = Motor hp x 0.746
Inputs used
  • Flow (gpm)
  • Total dynamic head (ft)
  • Pump efficiency (%)
  • Motor efficiency (%)
  • Specific gravity of liquid
  • Run hours per day (optional) (hours)
  • Power cost (optional) ($/kWh)

Worked example (White River WRRF, fictional)

  1. WHP = 1,000 x 60 / 3,960 = 15.15 hp
  2. BHP = 15.15 / 0.75 = 20.20 hp
  3. Motor hp = 20.20 / 0.92 = 21.96 hp
  4. kW = 21.96 x 0.746 = 16.38 kW
  5. Cost = 16.38 x 24 h x $0.10 = $39.31 per day

Tips

  • Hazen-Williams C of 120 to 140 is typical for lined pipe; use lower values for old, rough pipe.
  • Minor losses (fittings, valves) are not included; add them to static head if known.

Results are estimates for operator use. Check units and inputs, and confirm decisions with plant data and procedures.