Calculate how much sludge to waste each day to hold a target SRT.

WAS Rate for a Target SRT

Formula

WAS, lb/d = (Volume, MG x MLSS x 8.34 / Target SRT) - (Qe, MGD x TSSe x 8.34)
WAS, gpd = WAS lb/d / (WAS conc, mg/L x 8.34) x 1,000,000
Inputs used
  • Aeration basin volume (MG)
  • MLSS (mg/L)
  • Target SRT (days)
  • Effluent flow (MGD)
  • Effluent TSS (mg/L)
  • WAS concentration (mg/L)

Worked example (White River WRRF, fictional)

  1. Total to remove = 3.6 x 3,000 x 8.34 / 11.6 = 7,765 lb/d
  2. Effluent loss = 8.0 x 8 x 8.34 = 533.76 lb/d
  3. WAS = 7,765 - 533.76 = 7,231 lb/d
  4. WAS flow = 7,231 / (9,000 x 8.34) x 1,000,000 = 96,337 gpd

Tips

  • Change wasting by no more than about 10 to 15% per day.
  • Verify the WAS flow meter and WAS concentration.