A free process control resource from Wastewater Solutions, Inc.help@ActivatedSludge.com  |  503-701-2766
ActivatedSludge.comPractical wastewater process control

Aeration Basin Loading Calculator

Volumetric loading compares the BOD load with basin volume. Conventional activated sludge is often 20 to 40 lb BOD/1,000 ft³/d; extended aeration 10 to 25.

Aeration Basin Organic Loading

Formula

Loading, lb BOD/d per 1,000 ft³ = (Q, MGD x BOD x 8.34) / (Volume, MG x 133,680.6 / 1,000)
Inputs used
  • Flow to aeration (MGD)
  • Aeration influent BOD (mg/L)
  • Aeration volume (MG)

Worked example (White River WRRF, fictional)

  1. BOD load = 8.0 x 150 x 8.34 = 10,008 lb/d
  2. Volume = 3.6 x 133,680.6 / 1,000 = 481.3 thousand ft³
  3. Loading = 10,008 / 481.3 = 20.8

Tips

  • Use aeration influent BOD.
  • Compare with design and with F/M.

Results are estimates for operator use. Check units and inputs, and confirm decisions with plant data and procedures.